EV charging time and cost calculator

Estimate charge time and cost from the energy you add (or from pack size and state of charge), the charger power, and a charging efficiency you type.

Energy to add

Enter charging efficiency yourself (for example 0.90); there is no built-in default. The model is linear: it ignores the taper that slows charging near a full pack.

Enter values to see the result.

Linear estimate only: it ignores taper at high state of charge, so time near the top of the charge can be slightly optimistic.

Results are estimates. Check ratings with the manufacturer, and use a qualified electrician for installation.

EV charging time

In the linear model, hours = kWh to add ÷ charger kW when charging efficiency is 100%. If you enter a lower efficiency, both time and wall energy increase: wall kWh = kWh to add ÷ η, and time uses the charger power at that same efficiency.

Example: 60 kWh added at 7.4 kW and 100% efficiency takes 60 ÷ 7.4 = 8.11 hours. At 90% efficiency the same 60 kWh takes 9.01 hours and uses 66.67 kWh at the wall. The model ignores taper at high state of charge, especially on DC fast charging.

Hours to add 20, 40 or 60 kWh at 100% charging efficiency (linear, no taper)
Energy added2.3 kW7.4 kW11 kW50 kW
20 kWh8.70 h2.70 h1.82 h0.40 h
40 kWh17.39 h5.41 h3.64 h0.80 h
60 kWh26.09 h8.11 h5.45 h1.20 h

How long to charge an EV at home?

Enter the kWh you want to add and the charger power. Overnight on a 7.4 kW charger, 60 kWh is 8.11 hours in the 100% efficiency table, or 9.01 hours at 90%. A 2.3 kW charger takes 26.09 hours for the same 60 kWh at 100% efficiency, so it may not finish a large top-up overnight.

EV charging cost at home

Cost is wall energy times your unit rate. At 90% efficiency, 60 kWh added uses 66.67 kWh at the wall; at an example rate of 0.20 per kWh that costs 13.33. Type the rate from your bill. For a longer note on wall energy versus pack energy, see EV efficiency and the watts to kWh converter.

How much does it cost to charge an EV?

Multiply wall kWh by your unit rate. If you do not want to account for losses, set efficiency to 100% and the wall energy equals the kWh added; that understates cost whenever real efficiency is lower.

How long does it take to charge an EV?

Divide the energy to add by charger power, then adjust for efficiency as above, and remember the linear model does not include taper. Public DC fast charging at 50 kW would be 1.20 hours for 60 kWh in the table, but a real session often slows down before the pack is full.

Methodology and sources

Energy to add from pack and state of charge (percentages as fractions 0 to 1):

E_add,kWh = E_usable,kWh × (p_end − p_start)

Or you type kilowatt-hours to add directly. Charge time, wall energy and cost:

t_h = E_add,kWh / (P_charger,kW × η)

E_wall,kWh = E_add,kWh / η

cost = E_wall,kWh × r

Charge time is energy to add divided by charger power, then adjusted for the charging efficiency you enter. The model is linear: it ignores the taper at high state of charge, especially on DC fast charging. Charging-level definitions are in the EV charging levels guide (DOE Alternative Fuels Data Center, SAE J1772, IEC 61851). You enter efficiency; there is no built-in default.